4 × 4 ft slab: the short answer
Poured 4 inches thick (with 10% waste), a 4 × 4 ft slab needs about 5.9 cubic feet of concrete — roughly 10 × 80 lb bags, or about 0.22 cubic yards of ready-mix.
Slab size
A 4 × 4 ft slab poured 4 inches thick needs about 5.9 cubic feet of concrete — roughly 10 × 80 lb bags, or 0.22 cubic yards of ready-mix (includes 10% waste). Change the thickness, bag size, or shape below.
Concrete needed
—Enter dimensions to estimate concrete.
| Bags (incl. waste) | — |
|---|---|
| Ready-mix (cubic yards) | — |
| Volume (cubic feet) | — |
| Estimated cost | — |
Shopping list
Run the calculator to prepare a list.
Poured 4 inches thick (with 10% waste), a 4 × 4 ft slab needs about 5.9 cubic feet of concrete — roughly 10 × 80 lb bags, or about 0.22 cubic yards of ready-mix.
Concrete can't be reused once mixed, so the 10% allowance matters. For anything structural, confirm thickness and reinforcement with your local code. Adjust thickness and bag size in the calculator for your exact pour.
Standard volume math at 4″ with 10% waste; 80 lb bag ≈ 0.6 cu ft. Estimates only.
A 4 × 4 ft slab is a small pad for a generator, AC unit, grill, statue, or a single stepping-pad base. Because it is small, most people pour it with bags, and the practical questions are mix choice, a stable subgrade, and getting one clean pour before the mix sets.
For a pad this size, bagged mix is the normal route. The calculator assumes a 4-inch slab with 10% waste, which is a reasonable starting point for a small non-structural pad. Check the bag yield on the package — an 80 lb bag yields about 0.6 cu ft — and mix only what you can place before it begins to set.
At 4 inches thick with 10% waste, a 4 × 4 ft slab needs about 5.9 cubic feet — roughly 10 × 80 lb bags (or 14 × 60 lb), or 0.22 cubic yards of ready-mix.
At about 0.22 cubic yards this is small enough to do with bags (10 × 80 lb). For a single clean pour you could still order ready-mix, but bags are fine here.
Source links and page assumptions reviewed .
Estimate only, based on standard volume math at 4″ thickness with 10% waste. Confirm bag yield on the package and consult a pro for structural work.